Repair of risers and jacket structures with Cofferdam

Repair of risers and jacket structures with Cofferdam

PREZIOSO Linjebygg has effectively combined its surface treatment expertise with proven access methods and solutions in the offshore Oil & Gas environment to deliver its Cofferdam concept, which comprises the repair and maintenance (such as surface treatment and coating) of riser and jacket structure members below and above sea level in a confined and protected environment.

Since our first project in 2001 on the Heidrun platform in the Norwegian Sea, the PREZIOSO Linjebygg Cofferdam concept for riser and structural repair and maintenance makes it possible to execute surface repair and treatment in the splash zone during Oil & Gas production.

The Cofferdam secures a safe and dry working environment for our operational personnel and controlled air temperature/humidity conditions to optimise the surface preparation and treatment process
Each Cofferdam is installed by rope access and advanced rigging techniques, i.e. no need for crane support
Our Cofferdams are optimised for the specific structure and surroundings and the collection of waste
We perform our own engineering calculations and design of auxiliary substructures and supports that are required for each project.

Go back

Related news and events

Norway: Concrete inspection and rehabilitation on Statoil platforms

PREZIOSO Linjebygg has recently performed concrete inspection on gravity base structure shafts on three Statoil...

UK: flare tip replacements for Beryl Alpha - Apache UK

For Apache North Sea Limited, PREZIOSO Linjebygg has successfully supported exhaust tip replacements at the Beryl Alpha...

UK: Retrieval of caisson for Shell

In late March 2016, PREZIOSO Linjebygg received a purchase order from Shell UK (NAM) for the retrieval of a caisson at...

Norway: Successful shutdown on Ekofisk for Conocophillips

This summer’s shutdown on the Greater Ekofisk Area (NCS) involved 84 of our offshore staff, carrying out 23,000 hours of work during the shutdown period from...

 