Flare tip replacement and flare modifications

Flare tip replacement and flare modifications

PREZIOSO Linjebygg has been a pioneer in developing temporary lifting and rigging solutions in the Oil & Gas industry. One of our many speciality applications for these skills is the repair, modification and replacement of flare tips, without the need for helicopter assistance.

We have executed a range of flare tip replacements both onshore and offshore in the Oil & Gas industry. Our track record also includes flare boom modifications, the replacement of flare platforms, installation of new flare lines and supports, inspection of booms and towers, etc.

A thorough inspection of each site is performed before the project delivery phase starts. Our engineering department then completes all the necessary calculations to support our solution in the safest and most efficient way possible, always ensuring that the work can be performed in the tight timescale usually afforded during the operational shutdown.

The project execution phase combines our access experience with the use of light, purpose made lifting equipment. Standard lifting solutions are available for flare tips up to 5 tons, with tailor made lifting equipment being used on request. Our on-site project delivery team works always in close cooperation with our engineering department to ensure we optimise methods and use of lifting equipment.

Go back

Related news and events

Norway: Concrete inspection and rehabilitation on Statoil platforms

PREZIOSO Linjebygg has recently performed concrete inspection on gravity base structure shafts on three Statoil...

UK: flare tip replacements for Beryl Alpha - Apache UK

For Apache North Sea Limited, PREZIOSO Linjebygg has successfully supported exhaust tip replacements at the Beryl Alpha...

UK: Retrieval of caisson for Shell

In late March 2016, PREZIOSO Linjebygg received a purchase order from Shell UK (NAM) for the retrieval of a caisson at...

Norway: Successful shutdown on Ekofisk for Conocophillips

This summer’s shutdown on the Greater Ekofisk Area (NCS) involved 84 of our offshore staff, carrying out 23,000 hours of work during the shutdown period from...

 